Groupe Lechasseur / 2010

Next
Prev

Groupe Lechasseur / 2010

The Groupe Lechasseur asphalt plant hired RPF to install a medium voltage metering system and a 1.8-kilometre, 25,000-volt three-phase line, as well as all the transformer stations.