RPF Electrique 40 Ans

IOC-Rio Tinto / 2016

Next
Prev

IOC-Rio Tinto / 2016

Eight of our electricians went to Labrador City to handle running cables for a maintenance shutdown.

Next
Prev

Uniboard / 2015-2016

Fourteen RPF electricians completed the installation and commissioning of a lamination press at the Uniboard industrial complex in Sayabec, Quebec.

Next
Prev

Alouette / 2015

Three members of our team were responsible for installation and grounding of under-slab conduits for an AC rectifier at the Alouette aluminum smelter in Sept-Îles, Quebec.

Next
Prev

McInnis Cement / 2014-2016

Since 2014, RPF has completed several projects for McInnis Cement in Port-Daniel–Gascons, Quebec:

  • Installation of a medium voltage line for a temporary construction site;
  • Electrical grounding of buildings;
  • RPF built a network of underground concrete ducts for the medium voltage power lines.
Next
Prev

IOC-Rio Tinto / 2015-2016

Twelve members of the RPF team completed electrical work on the train-loading system at the IOC-Rio Tinto plant in Labrador City, Newfoundland & Labrador.

Next
Prev

ArcelorMittal / 2013

For the Mont Wright pumping station near Fermont, Qc. Six RPF electricians were responsible for the installation of the main electrical power supply 34.5 KV and the base building electrical installations.

Next
Prev

ProTech Mechanical / 2013

ProTech Mechanical hired RPF to complete a turnkey project for their heavy-equipment service and rebuild facility in Wabush, Newfoundland & Labrador, including engineering work and installation of all electrical systems. Four members of our team completed the work.

Next
Prev

Marmen Energy / 2005

In 2004, during construction of the Marmen plant in Matane, Quebec, twelve RPF electricians installed the building’s entire electrical system, including the main entrance and connection to all other electrical systems.