McInnis Cement / 2015

A team from RPF designed a network of underground concrete ducts to supply medium-voltage power from the substation to the electrical rooms.

Next
Prev

McInnis Cement / 2014-2015

RPF installed a metering chamber at the McInnis cement plant, as well as a 1.4-kilometre, 25-kV three-phase line to provide the power supply for the construction site.

Next
Prev

Viandes du Breton / 2015-2016

Viandes du Breton in Rivière-du-Loup, Quebec, awarded RPF a contract to extend the meat-packing plant’s 25,000–volt three-phase power line, in addition to installing the 25-kV, 2500-amp overhead and underground power supply and a pad-mounted transformer.

Next
Prev

ArcelorMittal / 2013

RPF installed 34.5KV overhead and underground power lines to supply a pumping station.

Next
Prev

Érablière Rock Morel

RPF installed a single phase medium voltage metering system and a 1.2 KM, 14,400-volt single-phase power line to provide electricity to the maple syrup facilities located in the forests of St-Narcisse, in the Lower St. Lawrence region of Quebec.

Next
Prev

Groupe Lechasseur / 2010

The Groupe Lechasseur asphalt plant hired RPF to install a medium voltage metering system and a 1.8-kilometre, 25,000-volt three-phase line, as well as all the transformer stations.

Next
Prev

Orbite Technologies / 2012

RPF received the contract to install the 25,000-volt medium voltage metering system for Orbite’s aluminum plant in Cap-Chat, Quebec, as well as the 4000-amp overhead and underground electrical supply.